Projects
Leviathan Onshore Development
HP 24" natural gas pipeline to Jerusalem
CP Supervision
Pipeline Lengh: 17 Km
Client: INGL
Year: 2018
Pipeline Lengh: 17 Km
Client: INGL
Year: 2018
Anode-bed installation and CP arrangements for pipeline under highway
Project Management and Tecnical Supervision of anode-bed installation and CP arrangements for pipeline under highway
Client: INGL
Yaer: 2020
Client: INGL
Yaer: 2020
HP 24" natural gas pipeline to Gaza Palestine
Eshel Hanasi-Mishor Rotem 12" and 10" Fuel Pipelines
CP Design
Pipelines Length: 84.5 Km + 84.5 km
Client: Petroleum & Energy Infrastructures Ltd (PEI)
Year: 2019
Pipelines Length: 84.5 Km + 84.5 km
Client: Petroleum & Energy Infrastructures Ltd (PEI)
Year: 2019
BAZAN- Elroy 12" Fuel Pipeline
CP Design
Pipeline Length: 11.5 Km
Client: Petroleum & Energy Infrastructures Ltd (PEI)
Year: 2019
Pipeline Length: 11.5 Km
Client: Petroleum & Energy Infrastructures Ltd (PEI)
Year: 2019
Karish – Tanin onshore HP natural gas 32"
CP Design
Pipeline Length: 1.2 Km
Engineering Contractor: TechnipFMC plus TMNG
Year: 2020
Client: Energean Oil&Gas
Pipeline Length: 1.2 Km
Engineering Contractor: TechnipFMC plus TMNG
Year: 2020
Client: Energean Oil&Gas
HP natural gas 18" Beer Tuvia
CP Supervision
Pipeline Length: 9.5 Km
Year: 2019
Client: INGL
Pipeline Length: 9.5 Km
Year: 2019
Client: INGL
Jenin Natural Gas Pipeline & Valve Station
Formosa Project, Taiwan Seawater Reverse Osmosis Desalination Plant
Mount Holland Lithium Mine
HP natural gas 24" Orot Rabin Power plant
Groundings installations for 36" eastern pipeline
CP project Management
Pipeline Length: 92 Km
Client: INGL
Year: 2018
Pipeline Length: 92 Km
Client: INGL
Year: 2018
Charles Meyer Desalination Project
Leviathan Production Platform
HP natural gas 36" Duplication K.Baroch-Dovrat
CP Design plus Design restrain systems to reduce the effects of short cut from nearby HV pilons 161 KV
Pipeline Length: 18.3 Km
Final Client: INGL
Year: 2018
Pipeline Length: 18.3 Km
Final Client: INGL
Year: 2018
CIPS survey
Handling data from CIPS surveys for presenting results and decisions making
Pipeline Length: >50 Km
Year: 2017
Year: 2017